Commercial Gates
Steel Gates in Sacramento
Swing gates, rolling gates, and man gates in iron or chain link, welded in our own shop.

Gate types
Swing or roll

Swing
A swing leaf needs clear ground through its whole arc. A double gate splits a wide opening into two leaves, so each leaf needs half the arc.

Roll
A rolling gate travels sideways on a V-track set into concrete. It needs a level concrete run for the track and clear fence line to travel into.
A man gate is usually 3 to 4 feet wide. A manual single swing leaf on a roller wheel can run over 25 feet. With an operator, a single swing leaf goes up to about 16 feet, and a wider opening becomes a double. Iron or chain link both work, and the existing fence line usually decides which.
Pricing
What a gate costs
The opening, the type, the material, and the hardware set the price.
A man gate added inside a fence run runs a few hundred. Automation is on top of the gate.
The width decides how much steel the gate takes, so a wider gate costs more. The material (iron or chain link), the powder coat, the concrete under the track of a rolling gate, and a roller wheel under a wide single leaf also change the price. If you need the gate to open by itself, that is access control, and it runs $5,000 to $10,000 and up on top.
Fast pricing
Three things to get you a price
How wide the opening is
The clear opening, post to post or curb to curb. The width decides if one leaf can cover it, or if the gate becomes a double or a rolling gate.
Swing or roll, and the look
Swing or roll, in iron or chain link, with a flat, spear, curve, or custom top on iron. The type decides what the ground has to provide, and the material changes the price.
A photo of the entrance
It shows the slope of the drive and what is on each side of the opening, which decide if the leaf can swing or the gate has to roll.
If the job has plans, send the plans and we quote to them.
Schedule
How long a gate takes
We build gates in our own shop, and for one to four gates that takes about a week. Powder coat is what stretches the schedule, because the gate goes to the coating shop after we build it. A gate that gets fabricated from scratch with powder coat and ADA hardware runs closer to two weeks before it is ready.
The install itself is short. Setting a gate takes one to two days, and that includes the posts and the concrete they sit in. If an operator is going on it, power has to be at the gate first, and that part is your electrician.

Install
How a gate goes in
The gate posts carry the whole load, so they are heavier than the fence posts beside them.
A rolling gate rides on V-track wheels along a galvanized track anchored into the concrete. The track has to sit on a level concrete run, so on a dirt or asphalt entrance the concrete goes in before the gate does.
We prefer Locinox Mammoth hinges. A double swing adds a cane bolt. An ADA gate adds self-closing hinges and a panic bar; many panic bars meet the requirements, and so do lever handles where the plans allow.
What you get
What we build

Work we’ve done
Projects

Get a price on your gate
Request a QuoteTestimonials
What our customers say
They did a great job and I’m very happy with my gate. I was scheduled for a Saturday and they called me up two days early to say they had time that day. Quick and professional, and the gate looks great and feels like good quality.
Francisco and his team did an excellent job replacing our iron gate. We’re very happy with the quality of the work, the price, and how quickly they completed the installation. We definitely plan to hire them for more iron fencing and gate work.
I’ve used this company several times for wrought iron fence and gate work, and they consistently deliver outstanding results. Professional, reliable, and easy to work with.
Custom fence and automatic gate. The good value and the quality of work sold me.
FAQs
Frequently asked questions
How much does a commercial gate cost in Sacramento?
The opening, the type, the material, and the hardware set the price. A gate runs about $1,600 to $10,000 installed. A man gate added inside a fence run costs a few hundred. Automation is $5,000 to $10,000 and up on top.
Swing gate or rolling gate, which one fits?
A swing gate needs the ground in front of it clear so the leaf can open through. A rolling gate needs concrete to run its track on and open fence line to travel along. On a driveway that slopes up, a rolling gate is usually the one, because a swing gate has to clear the rising ground.
How wide can a gate be?
A single swing leaf with an operator tops out around 16 feet, and a manual one on a roller wheel can pass 25 feet.
How long does a gate take?
About a week to build one to four gates in our shop. If the gate is fabricated from scratch and needs powder coat and ADA hardware, closer to two weeks, because the coating happens at a shop after we build. The install itself is one to two days.
What hardware comes on the gate?
A gate comes with hinges and a latch that takes a padlock, and a double swing also gets a cane bolt. An ADA gate adds a panic bar and self-closing hinges, and self-closing hinges can go on any walk gate.
Iron gate or chain link gate?
Both work. Budget, security, how you want it to look, and the fence already on the property decide it. Chain link can take privacy slats; iron comes in flat, spear, curved, and custom tops.
Can you automate the gate or add a keypad?
Yes. We install the operator and the controls with the gate. Power has to reach the gate first, and that part is your electrician.
Can you match or replace an existing gate?
Yes. We match the existing fence, rails, and finish, and we also rehang and modify gates that are already there when the frame is sound.
Do you repair gates, or only build new ones?
Both. Gate repair runs $800 to $3,000, including welds, hinges, frames, hardware, and slide-gate track work.
Get a quote
Send us your scope of work
Give us the opening width and swing or roll, with a photo of the entrance or the plans.
